Maintenance Capital Projects – Project Update History

Status Update As of: 12/7/2020

  • Installed new hot water tank for the Sierra Madre Building
  • Repaired deteriorated concrete walls on upper east-side Tennis Courts
  • Painted Health Science Building gutters
  • Air balancing of the Sierra Vista Building completed
  • Building Automation System (BAS) graphics completed for Sierra Vista, San Gabriel, and Administration buildings
  • Installed Needle-Point Bi-Polar Ionization System (NBIS) for two air handlers in the Library Building (3rd and 4th floors)
  • Installed a new hot water tank for the Sierra Madre Building
  • Elevator upgrades for Administration, San Rafael, and Auditorium buildings completed; new interior walls and LED lighting installed
  • Remodeled AD 249 for the Scholar’s Program and provided extra furniture to accommodate needs
  • Installed 3 additional dual electrical vehicle charging stations in Lot C; Brings total charging stations on Verdugo Campus to 12
  • Painted exterior east and south walls of the Administration Building
  • Renovated and completed inspection of Auditorium Building elevator
  • Painted and sealed west side of the Advanced Technology roof awning; repaired west side of gutters to prevent water penetration and leaks
  • Installed 2 wall mount sinks with sensor faucets in the Verdugo Campus CDC Playground
  • Rails installed for student safety at varying curb levels
  • Exterior lighting provided for increased student safety
  • Lift Maintenance hole covers to prevent rain water accumulation in vaults
  • Installing chilled drinking fountains with bottle fillers throughout campus