Status Update As of: 12/7/2020

  • IT enhancements in the majority of classrooms completed
  • Identified Math classroom to run a beta test of wireless capabilities; communication with potential IT engineering consultants for proposals of design network in progress
  • In process of implementing beta testing for wireless computer labs before implementing wireless computer lab concept in San Gabriel 2nd Floor/NSB Projects
  • Approximately 120 labs/classrooms received audio-visual upgrades
  • AT 208 computer lab door installed
  • San Rafael 1st Floor classroom HVAC EMS improvement
  • The LEE Committee will set annual Priorities.
  • 156 classrooms and labs identified; over 90 are complete to date