Project Events

David Viar Performing and Media Arts Center Groundbreaking Ceremony

Camino Real Ribbon Cutting Ceremonies – Oct 2026

The Camino Real Renovation project (17,660 sf), spanning two floors of the existing 1937 structure, was renovated for Dreamscape Learn (DSL) Virtual Reality (VR), Makerspace, e-Gaming and Student Inclusion Spaces.  The Camino Real Renovation Project showcased a transformed student hub that now features Dreamscape Virtual Reality, Esports, Maker Space, Sandbox, and Student Inclusion programs designed to support collaboration, creativity, and student success.

  • Inclusion Center Ribbon Cutting 10/5/2026
  • Camino Real Dreamscape Learn VRC Ribbon Cutting 10/16/2026