Verdugo Projects

Buena Vista Building – Phase II

Project Team

Project Manager Jim Bray, Gafcon, Inc.
Construction Manager John Theis, DPR Construction
Architect of Record Sean Rosebrugh, HMC Architects
Inspector of Record Tony Castiglioni, VIS Vital Inspection Services Inc.

Video

Description

Phase II will include the demolition of the Arroyo Seco and Santa Barbara buildings, and replacement of the passenger elevator connecting to the existing Camino Real Building. This project will also include new parking spaces and accessible walkways.

Status

Phase II 94%

Updates

11/Dec/2024:
What’s been done and what is coming up:

  • – Arm Gate – install complete.
  • – Buena Vista signage on South and West Side installed
  • – Paving and restriping of Campus Way to Lot A, Circle Drive and Loading Dock during WINTER intercession