Garfield Campus: Friday, 6/18 – Geotechnical soil survey will take place at the acquired surrounding Garfield properties sites at 7:00 AM. Coring and hand auguring processes will result in minimal noise disruption to the surrounding area.
Verdugo Campus: Monday, 6/14 to Friday, 6/18 – Partial closure of Campus Way between the entrance at Lot F up to the Central Receiving loading dock for New Science Building Project Site sound wall barrier activities to take place from 7:00 AM to 5:00 PM. Barriers and flag persons will be stationed in the area to ensure traffic safety and guide pass-through traffic; partial lane closures will impede traffic entering or exiting the campus.
Verdugo Campus: Monday, 4/26 – Partial closure of area between HS and AT buildings near the NSB Project site for utility trenching to take place for a duration of several weeks. Barricades and flag persons will be stationed on site to ensure traffic safety and guide pass-through traffic; there will be partial lane closures impeding traffic entering or exiting the campus.

District-wide Projects

Sustainability

Description

The environmental sustainability goals of the College District are ever expanding. The College is currently exploring the implementation of sustainable green technologies such as solar energy as well as lower CO2 emitting energies such as hydrogen fuel cells. These projects will be funded from Measure GC as well as sources independent from Measure GC.

Update

Project Completion: In Progress – 50%

Status Update As of: 5/17/2021 (Last two week’s activities in bold)

Status

In Progress 50%

Project Team

Project Manager Silva Sorkazian, Glendale Community College
General Contractor David Smith, Bloom Energy
Architect of Record TBD
Inspector of Record TBD